Switch Room - Control Power Unit
The switch room Asia is a singular power unit to control all the necessary components in
a project. These would include switchgears, uninterrupted power supply (UPS),
independent lighting, power, heating, fire alarm and other necessary devices.
All of these are fully tested before delivery to the consumer.
For
starters, the type-tested switchgears have to be compliant to all the relevant
specifications. The flexibility of the system is a must to integrate the
necessary components. As such, there is no need to interrupt the power supply
during maintenance work.
Prefab room
The pre-fabricated
room can be installed and commissioned in just hours upon arrival at the site.
They can include the aesthetic designs that will blend into the existing
buildings. The same goes for the skid solution in mounting switchgear, UPS,
battery racks, and the other interconnecting cable and bulbar trunking.
Designers
for pre-manufactured substations have to consider the many aspects of local and
international standards. This would also include the site specific requirements
and environmental conditions. The room will be designed after the establishment
of the criteria for typical information.
Considerations
The
manufacture shall have several considerations to follow. These include access
for personnel (for normal and emergency situations). The access for equipments would be for the
installation, operation and maintenance.
There
would be need to consider regulatory compliance and approvals. In the
installation, the considerations would include cable containment, earthing and
grounding, water sealing, air conditioning, lighting and small power. Fire
detection, alarm and suppression shall also be dealt with.
Supplier
A
supplier’s ability to manage a project shall also be a determining factor as an
end-user when choosing a pre-manufactured substation (like a switch room).
There will be several activities from a list of engineering disciplines which
will coordinate the maker’s work.
(The
suppliers that are able to offer the integration of all disciplines and manage
the process are needed for the project.)
Components / station uses
The
station must have its own high-powered air conditioners for climate control. The
same goes for its container insulation as well as the emergency exit walls, the
fire safety systems, floor and wall RHS framed penetrations and gland plates.
These
electrical switch and control rooms are critical to a site’s infrastructure
that houses everything. (Transformers / power distribution equipments / and
communications hub). Meanwhile, they can be used as the main switchboard rooms,
distribution equipment rooms, process control centers, data centers, battery
rooms and climate controlled test areas.
Construction
Some
companies have their prefabricated rooms for switching commissioned by
consumers that range from regular projects to roof top data center installation
and a roof top GRP enclosure. These usually require cyclone rating and contain
complex switching systems, advanced climate controls and internal smoke alarms
and fire suppression systems.
Depending
on the project, the customer can choose to have them fitted out with standards
they want that matches their projects.
A switch room Asia can be constructed on a concrete or galvanized steel base frame,
and floored with concrete sheet flooring. Finally, they can be designed,
manufactured and transported to the site as a complete unit.
Comments
Post a Comment